Mexican Ditch Trail Bridges Delivered

An update on the Mexican Ditch Trail Bridges from Ann Bollinger, Open Space Coordinator:

The two new pedestrian bridges for the Mexican Ditch Trail will be arriving on
Wednesday morning, February 4, approximately 7:30 a.m. to 9 a.m, possibly a
little later.

If you’d like to drive out and watch the progress, please park on
Buzzy’s Ranch Road. You can access the Mexican Ditch Trail between addresses
1561 and 1631. At that point, walk either direction – depending on your arrival
time and which bridge is in progress.

Finally, there will be large equipment during this process. Please be mindful
and keep a safe distance.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s