An update on the Mexican Ditch Trail Bridges from Ann Bollinger, Open Space Coordinator:
The two new pedestrian bridges for the Mexican Ditch Trail will be arriving on
Wednesday morning, February 4, approximately 7:30 a.m. to 9 a.m, possibly a
little later.
If you’d like to drive out and watch the progress, please park on
Buzzy’s Ranch Road. You can access the Mexican Ditch Trail between addresses
1561 and 1631. At that point, walk either direction – depending on your arrival
time and which bridge is in progress.
Finally, there will be large equipment during this process. Please be mindful
and keep a safe distance.